A manufacturing plant produces exactly 10 tons of a combination of three products per day. The production costs are five, four, and three dollars for products one, two, and three, respectively. The plant works 480 minutes per day. Each ton of product one, two, and three requires 45, 50, and 55 minutes of processing time, respectively. What is the correct linear programming model for minimizing the production cost?